logo
Search
cartCart
left chevron
Up ChevronDown Chevron
right chevron

EVM-3ESX50B15

Manufacturer

Panasonic

Description

Trimmer Pot, Cermet, 3MM Square, Open Frame / Trimmer Pot. Surface Mount 100 Kohm

Product Attributes

Type

Contact Plating

Length

Max Operating Temperature

Min Operating Temperature

Mount

Power Rating

Resistance

RoHS

Termination

Tolerance

Description

Tin

3.1 mm

100 °C

-40 °C

Surface Mount

150 mW

100 kΩ

Compliant

Foot Print

25 %

Out of Stock


Quantity
Shipment
delivery

Ships in 7-10 days

Add to Listarrow_icon

Quantity

Unit Price

Ext. Price

Product Attributes

Type

Contact Plating

Length

Max Operating Temperature

Min Operating Temperature

Mount

Power Rating

Resistance

RoHS

Termination

Tolerance

Description

Tin

3.1 mm

100 °C

-40 °C

Surface Mount

150 mW

100 kΩ

Compliant

Foot Print

25 %

Other Parts in the same category

3296Y-1-103LF

3296Y-1-103LF

Cermet trimmer potentiometer, 25 turns, 10 kΩ, 0.5 W, THT, on top, 3296Y-1-103LF

3329H-1-103LF

3329H-1-103LF

Res Cermet Trimmer 10K Ohm 10% 1/2W 1(Elec)/1(Mech)Turn (6.35 X 4.57mm) Pin Thru-Hole Tube

3296X-1-103LF

3296X-1-103LF

Cermet trimmer potentiometer, 25 turns, 10 kΩ, 0.5 W, THT, lateral, 3296X-1-103LF

3296W-1-103LF

3296W-1-103LF

Cermet trimmer potentiometer, 25 turns, 10 kΩ, 0.5 W, THT, on top, 3296W-1-103LF

3590S-1-102L

3590S-1-102L

Linear Rotary Potentiometer 1000 Ohms Plus or Minus 5 Percent Tolerance 2W Max IP40

3590S-1-501L

3590S-1-501L

Linear Rotary Potentiometer 500 Ohms Plus or Minus 5 Percent Tolerance 2W Max IP40

orange wave graphic

prototype to production:
With you at every step

From initial concept to final product, we ensure seamless support at every stage of your manufacturing journey.

orange wave graphic